If it's Happening, it's in the BoZone!
https://www.montana.edu/campusmap/#!/buildings/87
Work on the duck pond began on August 5, 2008 and was completed in the first week in October 2008. The duck pond reconstruction installed a new rubber liner, changed the shape to encourage better and increased water flow, and replaced the muddy banks of the duck pond with large flag stone.
(o) 406.539.6730
info@bozone.com